Design and construction of a rainwater collection and treatment system at a) Aircraft parking area, b) Engine repair rooms and c) Fire station at Athens International Airport “Eleftherios Venizelos”

The work includes the following:
•Hydraulic studies
•Design and selection of equipment
•Supply of equipment
•Supervision of installation

The project was carried out by us as subcontract by the main contractor, the German company AWAS International GmbH.

Construction and financing body: Athens International Airport (AIA).
Date of implementation: 2006, 2007, 2009, 2010, 2011.