The studies have been designed to address the environmental hazards of the shipyard’s overall activity and to meet the stricter rules and measures of environmental legislation.
Implementation study (hydraulic & hygiene) to upgrade the wastewater treatment facilities (capacity 1,000 p.e.)
Study on the management and treatment of ship oil residues (oil waste – bilge water)
Receptionsplan and management of ship-generated waste and cargo residues at the port of the yard.
Study of the rehabilitation and remediation of contaminated sites of the shipyard from petroleum products, paints and various other volatile organic compounds (VOCs).
At the same time, it was renewed the approval of environmental conditions for the plant operation.
Construction and financing body: Chalkis Shipyards S.A.
Date of implementation: 2012, 2013, 2014, 2015.