Improvement works for sewage treatment plant (population equivalent-p.e.: 18.000) including the hydraulic connection between thickening tank and the sludge dewatering belt press unit, hydraulic connection of the leachate tank with the aeration tank, new power room with Gen Set for energy supply, road construction within the plant, final disposal pumpstation with double vertical lineshaft pumps, supply tank for multilayer carbon filters and restoration of the underwater disposal pipeline PE Φ315 / 100m.

Public operator: Municipality of KIREAS-EVIA
Funding Organization: Program EPTA – THISEAS